GSD TO8 Test Plan
Assumptions:
- Performance testing of TO8 will be conducted on both gwar and the new
AWIPS II hardware. The gwar testing will allow comparison to TO6 performance.
- Both live and sample data will be used for testing.
Test cases (.doc) are linked to the case ID number.
TO8_0001:
- Test Objective: Determine the adequacy of the documentation and training
for TO8 testing.
- Type of information to be recorded: Staff input (solicited/unsolicited)
- Test Level: System
- Test Type/Class: Human Factors
- Qualification/Verification Method: Demonstration, Inspection, Similarity
TO8_0002:
- Test Objective: Determine whether TO8 software can be successfully
installed with the accompanying documentation/instructions.
- Type of information to be recorded: Feedback from installation focal points
- Test Level: System
- Test Type/Class: Human Factors
- Qualification/Verification Method: Demonstration
TO8_0003:
- Test Objective: Determine whether Raytheon test procedures and results
can be replicated at GSD using both real-time and supplied static data.
- Type of information to be recorded: Raytheon test procedure checklists
- Test Level: Subsystem
- Test Type/Class: Regression Testing
- Qualification/Verification Method: Demonstration, Similarity
TO8_0004: The work for this test case was done as part of the percent
completion task for AWIPS II.
- Test Objective: Ensure the radar capabilities promised for TO8 are
actually in the release.
TO8_0005:
- Test Objective: Compare TO8 performance with TO6 performance for test
procedures that can be run on both builds.
- Type of information to be recorded: action, elapsed time
- Test Level: System
- Test Type/Class: Regression & Performance Testing
- Qualification/Verification Method: Test, Analysis
- Special Requirements: Will run on gwar with TO6 test data to compare build
to build, and on new AWIPS II hardware.
TO8_0006:
- Test Objective: Compare TO8 test procedures with same procedures run on
an AWIPS build (i.e. side-by-side comparison). Look at user interface,
performance, etc.
- Type of information to be recorded: Raytheon test procedure checklists
- Test Level: Subsystem
- Test Type/Class: Regression & Functional Testing
- Qualification/Verification Method: Demonstration, Inspection, Test
TO8_0007:
- Test Objective: Once we see exactly what is in the build, conduct
additional tests that will utilize the system based on our knowledge of
operational use.
- Type of information to be recorded: TBD
- Test Level: Subsystem
- Test Type/Class: Functional Testing
- Qualification/Verification Method: Demonstration
TO8_0008:
- Test Objective: Determine flexibility of Purger
- Type of information to be recorded: extract purger events from logs,
inspect CAVE inventories
- Test Level: Subsystem
- Test Type/Class: Data Acquisition & Functional Testing
- Qualification/Verification Method: Demonstration, Inspection
TO8_0009:
- Test Objective: Add a new localization
- Type of information to be recorded: visual comparison to D2D scales, local
warning displays, WarnGen environment, Sunrise/Sunset default settings, etc.
- Test Level: Subsystem
- Test Type/Class: Functional & Human Factors Testing
- Qualification/Verification Method: Demonstration, Inspection
TO8_0010:
- Test Objective: Determine data integrity
- Type of information to be recorded: visual comparison, data sampling,
listings of text-based data, others TBD
- Test Level: Subsystem
- Test Type/Class: Data Acquisition & Functional Testing
- Qualification/Verification Method: Inspection, Analysis